top of page

Monosist has been appointed as Architectural Detail Design Consultant (DDC) for the detailed development of   KV MRT Line 2 Southern Section.  The scope covers for about 10.5 km corridor that includes 6 numbers of stations, Multi Storey Park & Ride, and other facilities.  The 120 meter long elevated stations are designed to cater for the ultimate passenger capacity of 33000 passengers per hour per direction (pphpd) by the year 2052.  

The design maximizes urban design opportunities to make a better connection between people and places, movement and urban form while maintaining a modern and forward-looking approach in its form and detailing.

MRT LINE 2 Southern Section (Serdang -Putrajaya)

​
bottom of page